Standard Time:
Standard Time is the time required for a qualified worker working at “Standard Performance” to perform a given task.
Standard time = [sewing time x {1+ (Skill + effort+ condition + consistency)} x (1 + allowance%)]
Foundation for measurement and organization of key business processes such as
- Production Targets
- Line Balancing
- Production Planning
- Incentive Schemes
- Operator Performance
- Factory Efficiency
- Factory Loading
- Factory per min costing
Standard operating condition and enviroment :
•Apply appropriate equipment and tools
•Noisy/light/temperature/humidity/ventilation should be at a appropriate level (Light-1000 Lux,Temp-22 C,Hu-65%)
•Distance between sewing machines should be under standard distance (60cm)
Tools to Determine Standard Time:
Time Study:
Time study is a direct and continuous observation of a task by using a timekeeping device to record the time taken to accomplish a task and it is often used.
(e.g., decimal minute stopwatch, computer-assisted electronic stopwatch, and videotape camera)
Performance Rating:
Rating is a subjective comparison of any condition or activity to a benchmark, based upon our experience.While the mechanics of time study record the time a task, then applying a rating will determine the time of the task should take.